Home » Uncategorized » US Power Grid May Become Unreliable This Summer, Watchdog Warns

Olduvai
Click on image to purchase

Olduvai III: Catacylsm
Click on image to purchase

Post categories

Post Archives by Category

US Power Grid May Become Unreliable This Summer, Watchdog Warns

US Power Grid May Become Unreliable This Summer, Watchdog Warns

A third of the country is facing an ‘elevated risk of blackouts’ soon, an industry expert said.

Parts of America could face difficulties in meeting electricity demand during the summer season, with renewable energy sources like wind and solar power posing a potential risk to reliable power supply, according to a report by the North American Electric Reliability Corporation (NERC).

The NERC report classifies several parts of the country as facing an “elevated” risk of summer electricity reliability for the upcoming June-September period.

Elevated risk means there is “potential for insufficient operating reserves” when the region faces above-normal demand conditions. Such regions include parts of Louisiana, Texas, New Mexico, Arizona, California, Illinois, and Iowa. The determination of elevated risk is based on various factors, including potential low wind or solar energy conditions that could lead to a lower electricity supply.

The North American power bulk power system (BPS) is made up of six regional entities—Midwest Reliability Organization (MRO), Northeast Power Coordinating Council (NPCC), ReliabilityFirst (RF), SERC Reliability Corporation (SERC), Texas Reliability Entity (Texas RE), Western Electricity Coordinating Council (WECC)—with elevated risk upcoming in certain regions.

Midcontinent Independent System Operator (MISO), which manages the electricity capacity market, operates in 15 U.S. states, including Texas, Illinois, Montana, Arkansas, and Kentucky. MISO is expected to have “sufficient resources” to meet normal summer peak demand, the NERC report said.

However, if MISO were to face above-normal peak demand conditions at a time when wind and solar output is lower than expected, it could be “challenging” for the transmission organization to meet demand.

…click on the above link to read the rest of the article…

Olduvai IV: Courage
Click on image to read excerpts

Olduvai II: Exodus
Click on image to purchase

Click on image to purchase @ FriesenPress