Daily inspection reports on the construction of the pipeline obtained by the Tar Sands Blockade, an activist group, renew questions about the pipeline’s integrity.
Mounting evidence that the pipeline was not built to mandated minimum requirements established by the American Petroleum Institute increases the chances the pipeline will leak or experience a catastrophic spill.
The reports — prepared by federal regulators with the Pipeline and Hazardous Materials Safety Administration (PHMSA) — reveal some code violations not previously disclosed. The number of reports also account for less than half the number of days the agency claims it spent inspecting the pipeline while it was being constructed.
Last year President Obama denied TransCanada a permit to build the northern route of the Keystone XL pipeline across the U.S.-Canada border.But his administration had fast-tracked the construction of the southern leg of the project in 2012.
The Keystone XL‘s southern route, renamed the Keystone Gulf Coast Pipeline when the project was split into sections, goes from Cushing, Oklahoma to the Gulf Coast. In Cushing, the pipeline connects to TransCanada’s pipeline network that originates in Alberta, Canada.
After mandatory safety tests revealed potential problems with the integrity of the southern pipeline, TransCanada dug up 130 sites and made repairs before the pipeline was permitted to start up.
PHMSA noted in its final inspection report that 37 sections of pipe had to be cut out and replaced and many areas of the pipeline’s coating had to be repaired.
…click on the above link to read the rest of the article…