{"id":50376,"date":"2020-01-01T11:37:08","date_gmt":"2020-01-01T16:37:08","guid":{"rendered":"https:\/\/olduvai.ca\/?p=50376"},"modified":"2020-01-01T11:37:14","modified_gmt":"2020-01-01T16:37:14","slug":"germany-aims-to-close-all-nuclear-plants-by-2022","status":"publish","type":"post","link":"https:\/\/olduvai.ca\/?p=50376","title":{"rendered":"Germany Aims To Close All Nuclear Plants By 2022"},"content":{"rendered":"\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/oilprice.com\/Alternative-Energy\/Nuclear-Power\/Germany-Aims-To-Close-All-Nuclear-Plants-By-2022.html\">Germany Aims To Close All Nuclear Plants By 2022<\/a><\/h3>\n\n\n\n<figure class=\"wp-block-image\"><img decoding=\"async\" src=\"https:\/\/d32r1sh890xpii.cloudfront.net\/article\/718x300\/b28ca44b8d51cce00652ed1519267d95.jpg\" alt=\"Nuclear plant\"\/><\/figure>\n\n\n\n<p>Germany is going forward with its plan to phase out nuclear reactors by 2022 as another nuclear power plant is going offline on December 31.<\/p>\n\n\n\n<p>Power company EnBW has&nbsp;<a href=\"https:\/\/www.enbw.com\/unternehmen\/presse\/pressemitteilungen\/presse-detailseite_222720.html\" target=\"_blank\" rel=\"noreferrer noopener\">said<\/a>&nbsp;that it would take the Philippsburg 2 reactor off the grid at 7 p.m. local time on New Year\u2019s Eve.<\/p>\n\n\n\n<p>This leaves Germany with six nuclear power plants that will&nbsp;<a href=\"https:\/\/uk.reuters.com\/article\/uk-germany-nuclearpower\/germany-takes-nuclear-plant-offline-final-six-to-close-over-two-years-idUKKBN1YY0W0?rpc=401&amp;\" target=\"_blank\" rel=\"noreferrer noopener\">have to close by 2022<\/a>.<\/p>\n\n\n\n<p>In the wake of the Fukushima disaster in Japan in 2011, Germany ordered the immediate shutdown of eight of its 17 reactors, and plans to&nbsp;<a href=\"http:\/\/www.dw.com\/en\/germanys-nuclear-phase-out-explained\/a-39171204\" target=\"_blank\" rel=\"noreferrer noopener\">phase out nuclear<\/a>&nbsp;power plants entirely by 2022.<\/p>\n\n\n\n<p>The Philippsburg 2 reactor near the city of Karlsruhe in southwestern Germany has provided energy for 35 years. The Philippsburg 1 reactor\u2014opened in 1979\u2014was taken offline in 2011.<\/p>\n\n\n\n<p>Over the past few years, nuclear power generation in Germany has been declining with the shutdown of its nuclear plants, while electricity production from renewable sources has been rising.<\/p>\n\n\n\n<p>In January this year, Germany became the latest large European economy to&nbsp;<a href=\"https:\/\/oilprice.com\/Energy\/Natural-Gas\/Germanys-Rush-To-Ditch-Coal-Is-Great-News-For-Norway.html\">lay out a plan to phase out<\/a>&nbsp;coal-fired power generation, aimed at cutting carbon emissions\u2014a metric in which Berlin has been lagging in recent years.<\/p>\n\n\n\n<p>A government-appointed special commission at Europe\u2019s largest economy announced the conclusions of its months-long review and proposed that Germany shut all its 84 coal-fired power plants&nbsp;<a href=\"https:\/\/www.latimes.com\/world\/europe\/la-fg-germany-coal-power-20190126-story.html\" target=\"_blank\" rel=\"noreferrer noopener\">by 2038<\/a>.&nbsp;<\/p>\n\n\n\n<p>Germany, where coal, hard coal, and lignite combined currently provide&nbsp;around&nbsp;35 percent of power generation, has a longer timetable for phasing out coal than the UK and Italy, for example\u2014who plan their coal exit by 2025\u2014not only because of its vast coal industry, but also because Germany will shut down all its nuclear power plants within the next three years.<\/p>\n\n\n\n<p>The closure of all nuclear reactors in Germany by 2022 means that Germany&nbsp;<a href=\"https:\/\/oilprice.com\/Latest-Energy-News\/World-News\/Germany-May-Need-Longer-Coal-Phase-Out-Timeline.html\">might need to retain<\/a>&nbsp;half of its coal-fired power generation until 2030 to offset the nuclear phase-out, German Economy and Energy Minister Peter Altmaier said earlier this year.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Germany Aims To Close All Nuclear Plants By 2022 Germany is going forward with its plan to phase out nuclear reactors by 2022 as another nuclear power plant is going offline on December 31. Power company EnBW has&nbsp;said&nbsp;that it would take the Philippsburg 2 reactor off the grid at 7 p.m. local time on New [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[3],"tags":[340,579,23083,14603],"class_list":["post-50376","post","type-post","status-publish","format-standard","hentry","category-energy-2","tag-fukushima","tag-nuclear-power","tag-oil-price-com","tag-tsvetana-paraskova"],"_links":{"self":[{"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/posts\/50376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/olduvai.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50376"}],"version-history":[{"count":1,"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/posts\/50376\/revisions"}],"predecessor-version":[{"id":50377,"href":"https:\/\/olduvai.ca\/index.php?rest_route=\/wp\/v2\/posts\/50376\/revisions\/50377"}],"wp:attachment":[{"href":"https:\/\/olduvai.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/olduvai.ca\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/olduvai.ca\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}